Contract chip manufacturers are convinced of this.
TSMC and UMC were forced to cut capital expenditures as demand for their advanced lithography components declined. At the same time, as DigiTimes explains, the demand for mature lithographic standards has not decreased, 40-nm, 28-nm and 22-nm technical processes are in demand. First of all, the chips produced on them are needed in the automotive segment.
Image Source: DigiTimes
recommendations
3060 is cheaper than 30tr in Citylink
3070 Gainward Phantom cheaper than 50 tr
12900K for 40tr starting in Citylink
3060 Ti Gigabyte deševle 40 tr v Regarde
13900K v Regarde according to the OLD course 62
10 kinds 4070 If in Citylink – all up to 100 tr
13700K deševle 40 tr v Regarde
3070 is cheaper than 50 tr in Citylink
13600K deševle 30 tr v Regarde
4080 for almost 100tr – cheaper than at the rate of 60
RTX 4090 for 140 tr in Regarde
Computers from 10 tr in Citylink
3070 Gigabyte Gaming for 50 tr from the beginning
RTX 3070 Ti for 56 tr in Citylink
-7% на 4080 Gigabyte Gaming
In principle, the forecasts of the automakers themselves on the continued shortage of semiconductor components until the end of this year confirm the presence of demand in this segment. Mature lithography is also needed in the production of components for Wi-Fi controllers. The electrification of the fleet is only increasing the demand for chips from the automotive industry, not to mention the trend of automating many vehicle control functions. The problem is exacerbated by the fact that contract manufacturers themselves are in no hurry to expand lines specializing in mature lithography, so supply continues to lag behind demand.