Aroged
  • Home
  • Games
  • Health
  • Technology
  • World
No Result
View All Result
  • Home
  • Games
  • Health
  • Technology
  • World
No Result
View All Result
Aroged
No Result
View All Result
Home Technology

In order to send humans to the moon no later than 2028, NASA decided to simplify the space suit for this task

Olivia Bennett by Olivia Bennett
September 3, 2026
in Technology
0
In order to send humans to the moon no later than 2028, NASA decided to simplify the space suit for this task
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

The U.S. Artemis 4 mission will mark the first human landing on the lunar surface this century. Astronauts have until 2028 to reach the South Pole of this Earth satellite, so the original technical specifications for developing a space suit for this mission must be simplified to speed up the process.

    Image source: Axiom Space

Image source: Axiom Space

NASA partners with Axiom Space must develop A new lightweight version of the spacesuit has been named the “Sortie Suit”. In addition to reducing weight and design complexity, it must provide better mobility for astronauts and simplify connections to the lunar module systems.

About four years ago, the task of developing a lunar space suit was assigned to Axiom Space and Collins Aerospace, but the latter later withdrew due to schedule delays and financial problems. Axiom Space remains the only NASA contractor capable of building a space suit to access the lunar surface, although it can’t boast a convincing pace of progress. Representatives from NASA and Axiom Space now meet six days a week, mostly in person, to continually adjust the lunar suit process to reflect changing priorities, people familiar with the matter said.

The initial version of the spacesuit (pictured above) increased the requirements for autonomy and protection of the astronauts, but turned out to be too bulky. NASA requires its design to be able to land on the lunar surface six times in 6.5 days, and even in storage mode, it can be used for spacewalks for 210 days. It was designed to protect astronauts from ultra-high and ultra-low temperatures and was specifically able to withstand a stay of up to two hours on the far side of the moon. It turned out that such a spacesuit would be too bulky and heavy, and Axiom’s manufacturing would likely fall behind schedule, so NASA reconsidered its priorities. First, a lighter assault suit will be created, and as practical experience is accumulated after manned lunar landings, NASA will re-formulate additional requirements. The equipment of this part of the astronauts will be gradually improved.

If you find an error, select it with your mouse and press CTRL+ENTER.

Related Posts

Xbox Series X Teardown | S to receive long-awaited multiplayer update in September
Technology

Xbox Series X Teardown | S to receive long-awaited multiplayer update in September

by Olivia Bennett
September 3, 2026
Digital Foundry analyzed GTA 6’s graphics and compared them to GTA 5 at max settings
Technology

Digital Foundry analyzed GTA 6’s graphics and compared them to GTA 5 at max settings

by Olivia Bennett
September 2, 2026
Xbox Series X receives Dragon’s Dogma 2 | S Full Performance Mode – How it works
Technology

Xbox Series X receives Dragon’s Dogma 2 | S Full Performance Mode – How it works

by Olivia Bennett
September 2, 2026
Xbox technical director explains why service job failed today
Technology

Xbox technical director explains why service job failed today

by Olivia Bennett
September 2, 2026
Journalist showed off screenshots of an early build of the Splinter Cell remaster, including notes written by the developer in Russian
Technology

Journalist showed off screenshots of an early build of the Splinter Cell remaster, including notes written by the developer in Russian

by Olivia Bennett
September 2, 2026
Next Post
Xbox Series X Teardown | S to receive long-awaited multiplayer update in September

Xbox Series X Teardown | S to receive long-awaited multiplayer update in September

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *


Math Captcha
five × = forty five


Editor’s Choice

Nintendo continues its war on Switch emulator: 400 code repositories closed on GitHub

Nintendo continues its war on Switch emulator: 400 code repositories closed on GitHub

August 21, 2026
Cougar releases LQX PRO, equipped with 3.95-inch IPS color display and water-cooled fan

Cougar releases LQX PRO, equipped with 3.95-inch IPS color display and water-cooled fan

August 25, 2026
Google Gemini will be able to “think” in the background while users do other things on their smartphones

Google Gemini will be able to “think” in the background while users do other things on their smartphones

September 1, 2026

Browse by Category

  • Games
  • Technology

Browse by Tags

action Add to adventure announcement CNC company cooperative detail DLC early access emulator fear Game play Gamescom 2026 Grand Theft Auto VI hojofors in the mall Ltd. Massively multiplayer online role-playing game mobile Multiplayer Netmarble new role nintendo switch 2 personal computer Playstation 5 release Release date renew roadmap rock star game role playing games sandbox shooter silver palace silver studio steam Strategy Survive test trailer uleifon video Xbox Series XS ZBT
Aroged

Aroged Gaming, Technology & AI News, Reviews, Guides, Trends and Digital Innovation. Stay ahead with the latest updates shaping the future of gaming and technology.

Categories

  • Games
  • Technology

Browse by Tag

action Add to adventure announcement CNC company cooperative detail DLC early access emulator fear Game play Gamescom 2026 Grand Theft Auto VI hojofors in the mall Ltd. Massively multiplayer online role-playing game mobile Multiplayer Netmarble new role nintendo switch 2 personal computer Playstation 5 release Release date renew roadmap rock star game role playing games sandbox shooter silver palace silver studio steam Strategy Survive test trailer uleifon video Xbox Series XS ZBT

Recent Posts

  • Xbox Series X Teardown | S to receive long-awaited multiplayer update in September
  • In order to send humans to the moon no later than 2028, NASA decided to simplify the space suit for this task
  • Digital Foundry analyzed GTA 6’s graphics and compared them to GTA 5 at max settings
  • About Us
  • Copyright Policy
  • Disclaimer
  • Terms and Conditions
  • Privacy Policy

© 2026 Aroged. All Rights Reserved.

Powered by
►
Necessary cookies enable essential site features like secure log-ins and consent preference adjustments. They do not store personal data.
None
►
Functional cookies support features like content sharing on social media, collecting feedback, and enabling third-party tools.
None
►
Analytical cookies track visitor interactions, providing insights on metrics like visitor count, bounce rate, and traffic sources.
None
►
Advertisement cookies deliver personalized ads based on your previous visits and analyze the effectiveness of ad campaigns.
None
►
Unclassified cookies are cookies that we are in the process of classifying, together with the providers of individual cookies.
None
Powered by
No Result
View All Result
  • Home
  • Games
  • Health
  • Technology
  • World

© 2026 Aroged. All Rights Reserved.

Go to mobile version